The transportable transformers of various sizes and voltages manufactured through the foresight of the General Electricity Board contributed to the fact that so little disruption of power supply was experienced in England despite frequent bombings. The availability of such transformers resulted in the electricity supply´s being reinstated in a very short time after disastrous enemy action, according to the Electrical Review, weekly London publication.