• DocumentCode
    1472665
  • Title

    A-C and D-C short-circuit tests on aircraft cable

  • Volume
    63
  • Issue
    12
  • fYear
    1944
  • Firstpage
    1359
  • Lastpage
    1360
  • Abstract
    J. C. Cunningham (Westinghouse Electric and Manufacturing Company, East Pittsburgh, Pa.): One of the most effective methods of improving the fault-clearing ability of an aircraft distribution system is to replace heavy cables by two or more smaller cables in parallel. By this means the probable thermal capacity of faults is reduced without a corresponding reduction in short-circuit current. The result is a reduction in fault time, damage, and fire hazard. The increased number of circuits further increases reliability by reducing the probability of losing all circuits.
  • Keywords
    Airplanes; Circuit faults; Maintenance engineering; Military aircraft; Power cables; Weapons;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1944.6440694
  • Filename
    6440694