Title :
How to improve the calibration of cost models
Author :
Ebrahimi, Nader B.
Author_Institution :
Div. of Stat., Northern Illinois Univ., DeKalb, IL, USA
Volume :
25
Issue :
1
fYear :
1999
Firstpage :
136
Lastpage :
140
Abstract :
One of software engineering´s long-standing problems is to estimate the cost of a software project. Using the volume or size of a program to estimate the cost is a common practice in many software development organizations. However, in many situations one is unable to observe the value of this variable at the beginning of the project; one has to estimate it. In this paper we introduce a fairly general model which permits a surrogate or a proxy variable to be observed instead of the actual size. Under this model we obtain estimation of software cost at the given value of a surrogate variable. A confidence interval is also provided under this model
Keywords :
calibration; project management; software cost estimation; software development management; confidence interval; cost model calibration; proxy variable; software engineering; software project cost estimation; surrogate variable; Calibration; Costs; Gaussian distribution; Mathematical model; Measurement errors; Parameter estimation; Regression analysis; Size measurement; Software measurement; Volume measurement;
fLanguage :
English
Journal_Title :
Software Engineering, IEEE Transactions on
Publisher :
ieee
ISSN :
0098-5589
Type :
jour
DOI :
10.1109/32.748922
Filename :
748922
Link To Document :
بازگشت