• DocumentCode
    1479878
  • Title

    HERA luminosity upgrade superconducting magnet production at BNL

  • Author

    Parker, B. ; Anerella, M. ; Escallier, J. ; Ghosh, A. ; Jain, A. ; Marone, A. ; Muratore, J. ; Prodell, A. ; Thompson, P. ; Wanderer, P. ; Wu, K.C.

  • Author_Institution
    Brookhaven Nat. Lab., Upton, NY, USA
  • Volume
    11
  • Issue
    1
  • fYear
    2001
  • fDate
    3/1/2001 12:00:00 AM
  • Firstpage
    1518
  • Lastpage
    1521
  • Abstract
    The production of two types of superconducting multi-function magnets, needed for the HERA Luminosity Upgrade is underway at BNL. Coil winding is now completed and cryostat assembly is in progress. Magnet type GO and type GG cold masses have been satisfactorily cold tested in vertical dewars and the first fully assembled GO magnet system has been horizontally cold tested and shipped to DESY. Warm measurements confirm that the coils meet challenging harmonic content targets. In this paper, the authors discuss GO and GG magnet design and construction solutions, field harmonic measurements and quench test results
  • Keywords
    accelerator magnets; particle accelerator accessories; production; superconducting coils; winding (process); BNL; HERA Luminosity Upgrade superconducting magnet production; accelerator magnets; coil winding; cold masses; construction solutions; cryostat assembly; field harmonic measurements; harmonic content targets; magnet design; quench test results; superconducting multi-function magnets; vertical dewars; Assembly; Detectors; Magnetic flux; Magnetic separation; Magnetosphere; Poles and towers; Production; Superconducting coils; Superconducting magnets; System testing;
  • fLanguage
    English
  • Journal_Title
    Applied Superconductivity, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1051-8223
  • Type

    jour

  • DOI
    10.1109/77.920064
  • Filename
    920064