DocumentCode :
1479878
Title :
HERA luminosity upgrade superconducting magnet production at BNL
Author :
Parker, B. ; Anerella, M. ; Escallier, J. ; Ghosh, A. ; Jain, A. ; Marone, A. ; Muratore, J. ; Prodell, A. ; Thompson, P. ; Wanderer, P. ; Wu, K.C.
Author_Institution :
Brookhaven Nat. Lab., Upton, NY, USA
Volume :
11
Issue :
1
fYear :
2001
fDate :
3/1/2001 12:00:00 AM
Firstpage :
1518
Lastpage :
1521
Abstract :
The production of two types of superconducting multi-function magnets, needed for the HERA Luminosity Upgrade is underway at BNL. Coil winding is now completed and cryostat assembly is in progress. Magnet type GO and type GG cold masses have been satisfactorily cold tested in vertical dewars and the first fully assembled GO magnet system has been horizontally cold tested and shipped to DESY. Warm measurements confirm that the coils meet challenging harmonic content targets. In this paper, the authors discuss GO and GG magnet design and construction solutions, field harmonic measurements and quench test results
Keywords :
accelerator magnets; particle accelerator accessories; production; superconducting coils; winding (process); BNL; HERA Luminosity Upgrade superconducting magnet production; accelerator magnets; coil winding; cold masses; construction solutions; cryostat assembly; field harmonic measurements; harmonic content targets; magnet design; quench test results; superconducting multi-function magnets; vertical dewars; Assembly; Detectors; Magnetic flux; Magnetic separation; Magnetosphere; Poles and towers; Production; Superconducting coils; Superconducting magnets; System testing;
fLanguage :
English
Journal_Title :
Applied Superconductivity, IEEE Transactions on
Publisher :
ieee
ISSN :
1051-8223
Type :
jour
DOI :
10.1109/77.920064
Filename :
920064
Link To Document :
بازگشت