• DocumentCode
    1480301
  • Title

    Power-line carrier Application

  • Author

    Moynihan, J. D. ; Allyn, E. G.

  • Author_Institution
    Sprague Electric Company, North Adams, Mass.
  • Volume
    75
  • Issue
    5
  • fYear
    1956
  • fDate
    5/1/1956 12:00:00 AM
  • Firstpage
    455
  • Lastpage
    455
  • Abstract
    RAPID LOAD GROWTH during the past few years has dictated the installation of new high-voltage transmission lines through densely populated urban areas served by The Detroit Edison Company. Overhead construction, being much cheaper, is preferred; however, right-of-ways difficulties or local ordinances may require underground construction or at least the use of a section of underground cable in a high-voltage line. A composite line of this description was selected to supply new Northwest Station and, also, serve as part of a system tie between existing Northeast and Evergreen Stations.
  • Keywords
    Attenuation; Companies; Ducts; Impedance; Microwave circuits; Steel; Wires;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1956.6441900
  • Filename
    6441900