Title :
Eastlake power plant reappraised
Author_Institution :
The Cleveland Electric Illuminating Company, Cleveland, Ohio
Abstract :
PROGRESS in the design of steam-electric generating stations is not an even, forward movement. New generators are installed in existing plants more frequently than in plants at new locations. The effect of this is that possibly 25 years or so can pass before the engineers have an opportunity to design a new plant, free of those restrictions which frequently make it impossible to utilize fully the new equipment which has been made available, as well as the new techniques which have been developed.
Keywords :
Companies; Generators; Integrated circuit reliability; Layout; Maintenance engineering; Power generation;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1956.6442261