• DocumentCode
    1485836
  • Title

    Validation of end-use load data from direct metering projects

  • Author

    Motter, John W. ; McGinley, John P.

  • Volume
    1
  • Issue
    3
  • fYear
    1988
  • fDate
    7/1/1988 12:00:00 AM
  • Firstpage
    33
  • Lastpage
    36
  • Abstract
    A major end-use metering project, designated the Energy Information Project (EIP), was begun in 1984 to collect detailed end-use load data on the Sierra Pacific Power Company´s major customer classes (e.g. residential, office, retail, and grocery). Data is being used to support load forecasting, planning for customer programs and other company activities. The procedure currently being used at Sierra to validate data is outlined. It consists of two major parts: initial validation and continual validation. Problems found as a result of data validation are discussed. Some recommendations are made for carrying out projects of this type.<>
  • Keywords
    load forecasting; metering; EIP; Energy Information Project; Sierra Pacific Power Company; customer program planning; end-use load data; end-use metering project; load forecasting; Current transformers; Data analysis; Demography; Hardware; Heat pumps; Inspection; Load forecasting; Refrigeration; Telephony; Water heating;
  • fLanguage
    English
  • Journal_Title
    Computer Applications in Power, IEEE
  • Publisher
    ieee
  • ISSN
    0895-0156
  • Type

    jour

  • DOI
    10.1109/67.921
  • Filename
    921