DocumentCode
1486646
Title
A Novel Approach to DSM-Based Activity Sequencing Problem
Author
Qian, Yanjun ; Lin, Jun ; Goh, Thong Ngee ; Xie, Min
Author_Institution
Sch. of Public Policy & Adm., Xi´´an Jiaotong Univ., Xi´´an, China
Volume
58
Issue
4
fYear
2011
Firstpage
688
Lastpage
705
Abstract
Recently, there has been a growing interest in applying the design structure matrix (DSM) for planning projects that consist of many interrelated activities. One important objective of planning is to find an activity sequence so as to minimize the sum of superdiagonal numbers in a DSM. It is known that the problem is NP-complete and is difficult to solve. In this study, we prove several structural properties of the problem, and propose a heuristic for obtaining good feasible solutions. We find that based on the fold operation, a block of activities can be treated as a single activity. A novel hybrid algorithm is then presented for solving large activity sequencing problems. Finally, we perform a number of experiments and show that good solutions can be easily obtained by our approach. Moreover, the improvement achieved by the proposed approach is significant.
Keywords
computational complexity; optimisation; planning; project management; DSM; DSM-based activity sequencing problem; NP-complete; design structure matrix; planning projects; Iterative methods; NP-complete problem; Optimization; Project management; Scheduling; Design structure matrix; heuristic; hybrid optimization approach; iterative process; project scheduling;
fLanguage
English
Journal_Title
Engineering Management, IEEE Transactions on
Publisher
ieee
ISSN
0018-9391
Type
jour
DOI
10.1109/TEM.2011.2107558
Filename
5741721
Link To Document