Expedient power line construction
Author :
Rorden, H. L.
Author_Institution :
Bonneville Power Administration, Portland, Oreg.
Volume :
66
Issue :
9
fYear :
1947
Firstpage :
884
Lastpage :
887
Abstract :
Material shortages during World War II imposed limitations on the construction of new transmission facilities and the Bonneville Power Administration conducted tests to determine minimum construction standards. Conductor diameter and spacing and insulation level involving losses, flashovers, safety to personnel working on energized lines, economic loading, and radio interference had to be considered.
Keywords :
Conductors; Corona; Noise; Poles and towers; Power transmission lines; Radio frequency; Transmission line measurements;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1947.6443716
Filename :
6443716
Link To Document :
بازگشت