DocumentCode
1493022
Title
Short-term resource scheduling with ramp constraints [power generation scheduling]
Author
Svoboda, Alva J. ; Tseng, Chung-Li ; Li, Chao-an ; Johnson, Raymond B.
Author_Institution
Pacific Gas & Electr. Co., San Francisco, CA, USA
Volume
12
Issue
1
fYear
1997
fDate
2/1/1997 12:00:00 AM
Firstpage
77
Lastpage
83
Abstract
This paper describes a Lagrangian relaxation-based method to solve the short-term resource scheduling (STRS) problem with ramp constraints. Instead of discretizing the generation levels, the ramp rate constraints are relaxed with the system demand constraints using Lagrange multipliers. Three kinds of ramp constraints, startup, operating and shutdown ramp constraints are considered. The proposed method has been applied to solve the hydro-thermal generation scheduling problem at PG&E. An example alone with numerical results is also presented
Keywords
hydrothermal power systems; optimisation; power system planning; scheduling; Lagrange multipliers; Lagrangian relaxation method; hydro-thermal generation scheduling; operating ramp; power system demand constraints; ramp rate constraints; short-term power generation scheduling; short-term resource scheduling; shutdown ramp; startup ramp; Chaos; Combustion; Hydraulic turbines; Lagrangian functions; Power engineering and energy; Power system modeling; Power systems; Spinning; State-space methods; Thermal loading;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/59.574926
Filename
574926
Link To Document