Title :
The Wheatstone bridge applied to train braking
Author_Institution :
Westinghouse Air Brake Company, Wilmerding, Pa.
fDate :
4/1/1948 12:00:00 AM
Abstract :
General information is given about a new scheme for indicating change from a balanced condition which can be used with any type of bridge circuit. The method is one which checks its own integrity and lends itself to applications demanding rugged apparatus, long life, and a minimum of maintenance.
Keywords :
Bridge circuits; Circuit faults; Magnetic circuits; Organizations; Relays; Resistance; Wires;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1948.6444050