DocumentCode
1494164
Title
Foreign
Volume
67
Issue
6
fYear
1948
fDate
6/1/1948 12:00:00 AM
Firstpage
619
Lastpage
619
Abstract
Canada — Hydroelectric Developments. The completion of a $10,000,000 hydroelectric project at Campbell River, Vancouver Island, British Columbia, Canada, was celebrated on December 15, 1947, when the first of two 25,000-horsepower units was placed in operation. The plant was planned by the provincial government to furnish power for industrial projects and to provide electric current to rural areas. (Foreign Commerce Weekly)
Keywords
Business; Eddy currents; Iron; Rotors; Standards; Stator cores; Transformer cores;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1948.6444184
Filename
6444184
Link To Document