DocumentCode
1495124
Title
Dielectric testing of solid insulation with respect to insulation coordination of low-voltage equipment
Author
Pfeiffer, W.
Author_Institution
Darmstadt Univ. of Technol., Germany
Volume
17
Issue
3
fYear
2001
Firstpage
34
Lastpage
47
Abstract
In real insulation systems with solid insulation, partial discharges usually occur far below the breakdown voltage. In the long run, these lead to the destruction of nearly all solid insulating materials. The question, How much time has passed until the partial discharges have destroyed the solid insulation?, is of little relevance in low-voltage equipment since the occurrence of partial discharge during normal use will, in general not allow a sufficient lifetime. Moreover, the results of such lifetime investigations are influenced by many parameters; therefore, statements with general validity cannot be made.
Keywords
dielectric measurement; electric breakdown; insulation co-ordination; insulation testing; partial discharge measurement; breakdown voltage; dielectric testing; insulation coordination; low-voltage equipment; partial discharge; solid insulation; Breakdown voltage; Circuit testing; Conductive films; Dielectrics and electrical insulation; Electric breakdown; Gas insulation; Insulation testing; Partial discharges; Solids; Stress;
fLanguage
English
Journal_Title
Electrical Insulation Magazine, IEEE
Publisher
ieee
ISSN
0883-7554
Type
jour
DOI
10.1109/57.925301
Filename
925301
Link To Document