DocumentCode
1496715
Title
Planning a large all-hydroelectric system
Author
Ward, M. ; Smith, H. A.
Author_Institution
Hydro-Electric Power Commission of Ontario, Toronto, Ontario, Canada
Volume
68
Issue
2
fYear
1949
Firstpage
117
Lastpage
121
Abstract
This article presents a summary of the development of the all-hydroelectric Southern Ontario system of the Hydro-Electric Power Commission of Ontario, in Canada, and discusses the major factors to be considered in planning this type of electric power supply system.
Keywords
Cities and towns; Frequency conversion; IEEE transactions; Planning; Rivers; Sociology; Statistics;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1949.6444601
Filename
6444601
Link To Document