DocumentCode :
150291
Title :
A study on project scope as a requirements elicitation issue
Author :
Neetu Kumari, Sethia ; Pillai, Anitha S.
Author_Institution :
Dept. of Master of Comput. Applic., Hindustan Univ., Chennai, India
fYear :
2014
fDate :
5-7 March 2014
Firstpage :
510
Lastpage :
514
Abstract :
Project scoping of features and functionalities required to meet the system objectives is critical for project success. An accurate determination of the system boundary to develop software has long been identified as a challenge that practitioners have been attempting to overcome. It is, therefore, important to understand the causes along with the consequences of poor project scope. This study presents the findings pertaining to project scope that influence the requirements elicitation activity and thereby impact the overall requirements engineering process. The causes that lead to such scope issues and related consequences are summarized. The challenges encountered due to poor scope are depicted using a cause-and-effect diagram. This study provides guidance that can assist practitioners to identify areas for improvements in determining project scope and that which can have a positive influence on the overall requirements elicitation process.
Keywords :
project management; software engineering; systems analysis; cause-and-effect diagram; project scoping; requirements elicitation activity; requirements elicitation issue; requirements engineering process; software development; Law; Organizations; Schedules; Software; Software engineering; Cause-and-effect diagram; Project scope; Requirements elicitation; Requirements elicitation issues;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computing for Sustainable Global Development (INDIACom), 2014 International Conference on
Conference_Location :
New Delhi
Print_ISBN :
978-93-80544-10-6
Type :
conf
DOI :
10.1109/IndiaCom.2014.6828190
Filename :
6828190
Link To Document :
بازگشت