  • Title

    Zig-zag configuration for ring-bus substation

  • Author

    Connelly, R. N. ; Gibbons, R. F.

  • Author_Institution
    Sacramento Municipal Utility District, Sacramento, Calif.
  • Volume
    78
  • Issue
    2
  • fYear
    1959
  • Firstpage
    147
  • Lastpage
    147
  • Abstract
    THE NEW HEDGE SUBSTATION of Sacramento Municipal Utility District, located a few miles southeast of Sacramento, Calif., is designed to receive firming power over two lines from Pacific Gas and Electric Company plus substantial amounts of power from the U. S. Bureau of Reclamation Central Valley Project and from the new Upper American River Project, all at number of disconnecting switches and insulation points is small; extra buses are not required; relaying is not overly difficult; and when a line is disconnected the ring may still be closed.
  • Keywords
    Associate members; Circuit breakers; Companies; Insulation; Joining processes; Rivers; Substations;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1959.6446206
  • Filename
    6446206