DocumentCode :
1507475
Title :
Project scheduling with resource constraints
Author :
Dike, Sheldon H.
Author_Institution :
Dikewood Corporation, Albuquerque, N. Mex.
Issue :
4
fYear :
1964
Firstpage :
155
Lastpage :
157
Abstract :
A method of scheduling projects with varied resource constraints is suggested. It is intended for use on nearly any computer, and can be modified easily for specific problem needs. Six steps are explained and sample schedules are included.
Keywords :
Barium; Computers; Cranes; Delay; Fixtures; Schedules; Wires;
fLanguage :
English
Journal_Title :
Engineering Management, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9391
Type :
jour
DOI :
10.1109/TEM.1964.6446423
Filename :
6446423
Link To Document :
بازگشت