DocumentCode :
1512194
Title :
Probabilistic models of project management with design implications
Author :
Brown, Randall A.
Author_Institution :
Dept. of Industrial & Systems Engng., School of Sci. Engng., Univ. of Alabama, Huntsville, AL, USA
Issue :
2
fYear :
1978
fDate :
5/1/1978 12:00:00 AM
Firstpage :
43
Lastpage :
49
Abstract :
As project management has come of age, there has been an increasing awareness of the fact that the greater the inherent difficulty of the R&D activity, the more likely it becomes that the project will encounter cost and schedule overruns. Some authors have even gone so far as to call for `built-in´ allowances for overruns. It is the purpose of this paper to point out not only that such a scheme is necessary, but also to show the magnitude of the required allowances and their sensitivity to the distribution of risk associated with the project.
Keywords :
management science; project engineering; design; probabilistic models; project management; Ceramics; Density functional theory; Electric breakdown; Procurement; Project management; Schedules;
fLanguage :
English
Journal_Title :
Engineering Management, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9391
Type :
jour
DOI :
10.1109/TEM.1978.6447281
Filename :
6447281