    Probabilistic models of project management with design implications

  • Author

    Brown, Randall A.

  • Author_Institution
    Dept. of Industrial & Systems Engng., School of Sci. Engng., Univ. of Alabama, Huntsville, AL, USA
  • Issue
    2
  • fYear
    1978
  • fDate
    5/1/1978 12:00:00 AM
  • Firstpage
    43
  • Lastpage
    49
  • Abstract
    As project management has come of age, there has been an increasing awareness of the fact that the greater the inherent difficulty of the R&D activity, the more likely it becomes that the project will encounter cost and schedule overruns. Some authors have even gone so far as to call for `built-in´ allowances for overruns. It is the purpose of this paper to point out not only that such a scheme is necessary, but also to show the magnitude of the required allowances and their sensitivity to the distribution of risk associated with the project.
  • Keywords
    management science; project engineering; design; probabilistic models; project management; Ceramics; Density functional theory; Electric breakdown; Procurement; Project management; Schedules;
  • fLanguage
    English
  • Journal_Title
    Engineering Management, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9391
  • Type

    jour

  • DOI
    10.1109/TEM.1978.6447281
  • Filename
    6447281