DocumentCode
1512194
Title
Probabilistic models of project management with design implications
Author
Brown, Randall A.
Author_Institution
Dept. of Industrial & Systems Engng., School of Sci. Engng., Univ. of Alabama, Huntsville, AL, USA
Issue
2
fYear
1978
fDate
5/1/1978 12:00:00 AM
Firstpage
43
Lastpage
49
Abstract
As project management has come of age, there has been an increasing awareness of the fact that the greater the inherent difficulty of the R&D activity, the more likely it becomes that the project will encounter cost and schedule overruns. Some authors have even gone so far as to call for `built-in´ allowances for overruns. It is the purpose of this paper to point out not only that such a scheme is necessary, but also to show the magnitude of the required allowances and their sensitivity to the distribution of risk associated with the project.
Keywords
management science; project engineering; design; probabilistic models; project management; Ceramics; Density functional theory; Electric breakdown; Procurement; Project management; Schedules;
fLanguage
English
Journal_Title
Engineering Management, IEEE Transactions on
Publisher
ieee
ISSN
0018-9391
Type
jour
DOI
10.1109/TEM.1978.6447281
Filename
6447281
Link To Document