DocumentCode
1512318
Title
A practical tool for improved resource allocation: The dynamic time now procedure
Author
Van Roy, T.J. ; Gelders, L.F.
Author_Institution
Dept. of Industrial Management, Katholieke Univ. Leuven, Leuvain, Belgium
Issue
4
fYear
1978
Firstpage
93
Lastpage
97
Abstract
Concerns the resource allocation problem in project management. Besides a review of the literature, a new heuristic method, the dynamic time now procedure, is presented. Unlike the classical heuristics, it appears to be less affected by the network and resource characteristics of the project. This yields significant project duration reduction, especially on projects with a heterogeneous network structure, as they generally are in practice. The proposed method has been used for a real-life project, the results of which are commented upon.
Keywords
management science; operations research; dynamic time now procedure; heterogeneous network structure; resource allocation; Computers; Delay; Dynamic scheduling; Processor scheduling; Project management; Resource management; Schedules;
fLanguage
English
Journal_Title
Engineering Management, IEEE Transactions on
Publisher
ieee
ISSN
0018-9391
Type
jour
DOI
10.1109/TEM.1978.6447303
Filename
6447303
Link To Document