• DocumentCode
    1512385
  • Title

    A construction scheduling system with resource allocation for electric utilities

  • Author

    Economides, S.C. ; Duesterhoeft, W.C.

  • Author_Institution
    City Public Service, San Antonia, TX, USA
  • Issue
    1
  • fYear
    1977
  • Firstpage
    2
  • Lastpage
    7
  • Abstract
    The general design and the basic characteristics of the individual components of a construction scheduling mechanism for electric utilities, which is currently being implemented at the City Public Service of San Antonio, Texas, are described. The operational-planning portion of this mechanism is comprised of four conventional quantitative-analysis models with the tasks of developing pertinent cost parameters, optimally assigning construction projects to service centers, and routing service crews to project sites. Also described is HAMPS, a developed heuristic program which schedules the projects and performs resource allocation. An example is given to illustrate the operation of HAMPS on which the focus of the discussion is placed. The other portion of the construction scheduling mechanism is a strategic-planning package for estimating, at low cost, future resource requirements as an aid in the daily resource-allocation process.
  • Keywords
    construction industry; management science; scheduling; HAMPS heuristic program; construction scheduling system; electric utilities; resource allocation; Biological system modeling; Cities and towns; Computational modeling; Job shop scheduling; Resource management; Schedules;
  • fLanguage
    English
  • Journal_Title
    Engineering Management, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9391
  • Type

    jour

  • DOI
    10.1109/TEM.1977.6447314
  • Filename
    6447314