A construction scheduling system with resource allocation for electric utilities
Author
Economides, S.C. ; Duesterhoeft, W.C.
Author_Institution
City Public Service, San Antonia, TX, USA
Issue
1
fYear
1977
Firstpage
2
Lastpage
7
Abstract
The general design and the basic characteristics of the individual components of a construction scheduling mechanism for electric utilities, which is currently being implemented at the City Public Service of San Antonio, Texas, are described. The operational-planning portion of this mechanism is comprised of four conventional quantitative-analysis models with the tasks of developing pertinent cost parameters, optimally assigning construction projects to service centers, and routing service crews to project sites. Also described is HAMPS, a developed heuristic program which schedules the projects and performs resource allocation. An example is given to illustrate the operation of HAMPS on which the focus of the discussion is placed. The other portion of the construction scheduling mechanism is a strategic-planning package for estimating, at low cost, future resource requirements as an aid in the daily resource-allocation process.
Keywords
construction industry; management science; scheduling; HAMPS heuristic program; construction scheduling system; electric utilities; resource allocation; Biological system modeling; Cities and towns; Computational modeling; Job shop scheduling; Resource management; Schedules;
fLanguage
English
Journal_Title
Engineering Management, IEEE Transactions on
Publisher
ieee
ISSN
0018-9391
Type
jour
DOI
10.1109/TEM.1977.6447314
Filename
6447314
Link To Document