DocumentCode
1513377
Title
Optimal short term hydro scheduling including security constraints
Author
Johannesen, A. ; Gjelsvik, A. ; Fosso, O.B. ; Flatabø, N.
Author_Institution
Norwegian Electr. Power Res. Inst., Trondheim, Norway
Volume
6
Issue
2
fYear
1991
fDate
5/1/1991 12:00:00 AM
Firstpage
576
Lastpage
583
Abstract
A method is presented for short-term production scheduling in a hydro system. The solution technique is based on iterative network linear programming and heuristic techniques. The method handles security constraints due to single branch and specified multiple contingencies. The postcontingency rescheduling capabilities are modeled explicitly in a DC optimal load flow. Using the rescheduling capabilities increases the transmission network utilization
Keywords
hydroelectric power; linear programming; load flow; power systems; scheduling; DC optimal load flow; heuristic techniques; hydro system; iterative network linear programming; security constraints; short-term production scheduling; transmission network utilization; Boundary conditions; Costs; Linear programming; Load flow; Power system modeling; Power system planning; Power system security; Production systems; Spinning; Water storage;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/59.76700
Filename
76700
Link To Document