Operations planning of Colombian hydro-thermal interconnected system
Author :
Hernández, H.M. ; Díaz, J.A. ; Sanchex, G.A. ; Olarte, A.
Author_Institution :
Interconexion Electr. SA, Medellin, Colombia
Volume :
6
Issue :
2
fYear :
1991
fDate :
5/1/1991 12:00:00 AM
Firstpage :
778
Lastpage :
786
Abstract :
A description is presented of the development, implementation, and operations planning for the Colombian hydrothermal interconnected power system. Advanced methodologies for optimization of hydrothermal generation scheduling were implemented and are currently being used by the system. A high degree of participation by personnel from all of the interconnected utilities was adopted during the definition and development of the organizational structure and methodologies. Feedback channels among the various personnel were implemented and widely used. Operations planning agreements were defined, including the commercial and operational aspects. The operational structure is outlined along with operations planning agreements and various experiences encountered during development and actual operation
Keywords :
hydroelectric power stations; optimisation; power system interconnection; power system planning; scheduling; thermal power stations; Colombia; development; generation scheduling; hydroelectric power stations; hydrothermal interconnected power system; operations planning; optimization; personnel; thermal power stations; utilities; Feedback; Instruction sets; Integrated circuit interconnections; Interconnected systems; Optimization methods; Power industry; Power system interconnection; Reservoirs; Samarium; Scheduling;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.76725
Filename :
76725
Link To Document :
بازگشت