• DocumentCode
    1516266
  • Title

    Scheduling in dual gripper robotic cells for productivity gains

  • Author

    Sethi, Suresh P. ; Sidney, Jeffrey B. ; Sriskandarajah, Chelliah

  • Author_Institution
    Texas Univ., Dallas, TX, USA
  • Volume
    17
  • Issue
    3
  • fYear
    2001
  • fDate
    6/1/2001 12:00:00 AM
  • Firstpage
    324
  • Lastpage
    341
  • Abstract
    We consider single part-type problems. Since all parts produced are identical, it is sufficient to determine the sequence of moves performed by the robot. The processing constraints define the cell to be a flowshop. The objective is the minimization of the steady-state cycle time to produce a part, or equivalently the maximization of the throughput rate. We study the problem of scheduling robot moves in dual gripper robot cells functioning in a bufferless environment. We develop an analytical framework for studying dual gripper robotic cells and examine the cycle time advantage of using a dual gripper rather than a single gripper robot. It is shown that an m-machine dual gripper robot cell can have at most double the productivity of its single gripper counterpart. We also propose a practical heuristic algorithm to compare productivity for given cell data. Computational testing of the algorithm on realistic problem instances is also described
  • Keywords
    industrial manipulators; operations research; optimisation; production control; cycle time; dual gripper robotic cells; flowshop; heuristics; industrial robots; production control; productivity gains; scheduling; Automatic control; Grippers; Heuristic algorithms; Process design; Production; Productivity; Robot kinematics; Robotics and automation; Testing; Throughput;
  • fLanguage
    English
  • Journal_Title
    Robotics and Automation, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1042-296X
  • Type

    jour

  • DOI
    10.1109/70.938389
  • Filename
    938389