• DocumentCode
    1517994
  • Title

    On electrical analogy of critical path method

  • Author

    Shankar, K. ; Nair, K.P.K.

  • Author_Institution
    Department of Operations Research, Case Western Reserve University, Cleveland, Ohio.; Indian Institute of Technology, Bombay, India
  • Issue
    2
  • fYear
    1972
  • fDate
    5/1/1972 12:00:00 AM
  • Firstpage
    68
  • Lastpage
    71
  • Abstract
    Critical path method of project planning, scheduling, and control has gained considerable importance because of its theoretical novelty ad practical value. Essentially, this technique is based on the theory of flow through network. Although the structure of a project network is analogous to the electrical net, the branch characteristics fail to show the analogy. Battersby has solved this problem by introducing two kinds of floats, namely, duration and resource floats, in the network. In this paper, a complete electrical analogy is established following a somewhat different approach. With this approach, current is injected or released at the appropriate nodes. The resulting θ, paramount, and dominant matrices present elegance. Further, based on the analogy, a procedure for representing the complete spectrum of costs and schedules is indicated. Also, a useful approach for sensitivity evaluation is presented.
  • Keywords
    management; project engineering; critical path method; electrical analogy; Computer crashes; Equations; Industries; Personnel; Remuneration; Schedules; Sensitivity;
  • fLanguage
    English
  • Journal_Title
    Engineering Management, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9391
  • Type

    jour

  • DOI
    10.1109/TEM.1972.6448378
  • Filename
    6448378