DocumentCode
1518998
Title
A probability approach for the optimization of the PERT network and investments in R and D projects
Author
Ettinger, Y. ; Frank, Gary
Author_Institution
Soreq Nuclear Research Centre, Yavne, Israel
Issue
2
fYear
1981
fDate
5/1/1981 12:00:00 AM
Firstpage
31
Lastpage
31
Abstract
A probability approach for accounting for uncertainties in the duration of activities in a PERT network is proposed. The effects of a delay in an activity on related activities are considered. They are incorporated in a stochastic network which permits a more realistic and comprehensive estimate of the time needed for executing a project. A sensitivity analysis indicates and evaluates the critical activities which will have a pronounced effect on the progress of the project. Following the sensitivity analysis an optimization scheme is devised for investment of additional resources in critical activities, in order to minimize cost or extension of the project timetable. Optimization criteria for investments of additional resources in delayed activities are also derived and the importance of a reliable reporting system is demonstrated.
Keywords
PERT; optimisation; probability; research and development management; PERT network; R and D projects; delay; investments; optimization; probability; project timetable; reporting system; sensitivity analysis; stochastic network; uncertainties; Delay; Failure analysis; Furnaces; Investments; Optimization; Planning; Uncertainty;
fLanguage
English
Journal_Title
Engineering Management, IEEE Transactions on
Publisher
ieee
ISSN
0018-9391
Type
jour
DOI
10.1109/TEM.1981.6448574
Filename
6448574
Link To Document