    Load dispatching and the reasons for it, with special reference to the British grid system

  • Author

    Cooper, A.R.

  • Author_Institution
    British Electricity Authority, UK
  • Volume
    95
  • Issue
    48
  • fYear
    1948
  • fDate
    12/1/1948 12:00:00 AM
  • Firstpage
    713
  • Lastpage
    723
  • Abstract
    The paper describes some of the problems which arise in providing for security of supplies and economical operation on the British Grid system. Under these two headings separate consideration is given to long-term and short-term planning. Long-term planning of the system determines what generating plant and transmission equipment will be provided, and the paper indicates the extent to which actual plant/load conditions have varied from those which were planned three years previously. Short-term planning is concerned with the operation of the system as it exists and a description is given of a typical day´s operation of the British Grid system. Reference is also made to the operation of the system during the 1947 fuel crisis and to other operating conditions of special interest. Probable future developments associated with load dispatching are mentioned and special attention is drawn to the financial savings which could be obtained by providing better availability on high-merit plant.
  • Keywords
    power system interconnection;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineers - Part II: Power Engineering, Journal of the Institution of
  • Publisher
    iet
  • Type

    jour

  • DOI
    10.1049/ji-2.1948.0200