DocumentCode :
1520235
Title :
Monthly report pyramid
Author :
Evans, J.M. ; Litzinger, R.
Author_Institution :
Westinghouse Electric Corp., Pittsburgh, PA, USA
Issue :
2
fYear :
1984
fDate :
6/1/1984 12:00:00 AM
Firstpage :
82
Lastpage :
84
Abstract :
Westinghouse Electric Corporation´s Water Reactor Division Office Systems Operations group has developed a process that pyramids the text of first-level managers´ monthly reports into a departmental report for the second-level manager. The individual reports are typed and read into a word processing system through an optical character recognition device and telecommunicated to the central site where they are electronically combined into a departmental summary report. The second-level manager can then use a CRT for a final edit or send the document to word processing for additions or corrections. The biggest advantage of this process is that the second-level manager no longer has to wade through paper and cut and paste to prepare the monthly report.
Keywords :
report generators; word processing; ADP; CRT; departmental report; first-level managers´ monthly reports; optical character recognition; second-level manager; word processing system; Adaptive optics; Encoding; Inductors; Optical devices; Postal services; Terminology; Text processing;
fLanguage :
English
Journal_Title :
Professional Communication, IEEE Transactions on
Publisher :
ieee
ISSN :
0361-1434
Type :
jour
DOI :
10.1109/TPC.1984.6448800
Filename :
6448800
Link To Document :
بازگشت