• DocumentCode
    1520235
  • Title

    Monthly report pyramid

  • Author

    Evans, J.M. ; Litzinger, R.

  • Author_Institution
    Westinghouse Electric Corp., Pittsburgh, PA, USA
  • Issue
    2
  • fYear
    1984
  • fDate
    6/1/1984 12:00:00 AM
  • Firstpage
    82
  • Lastpage
    84
  • Abstract
    Westinghouse Electric Corporation´s Water Reactor Division Office Systems Operations group has developed a process that pyramids the text of first-level managers´ monthly reports into a departmental report for the second-level manager. The individual reports are typed and read into a word processing system through an optical character recognition device and telecommunicated to the central site where they are electronically combined into a departmental summary report. The second-level manager can then use a CRT for a final edit or send the document to word processing for additions or corrections. The biggest advantage of this process is that the second-level manager no longer has to wade through paper and cut and paste to prepare the monthly report.
  • Keywords
    report generators; word processing; ADP; CRT; departmental report; first-level managers´ monthly reports; optical character recognition; second-level manager; word processing system; Adaptive optics; Encoding; Inductors; Optical devices; Postal services; Terminology; Text processing;
  • fLanguage
    English
  • Journal_Title
    Professional Communication, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0361-1434
  • Type

    jour

  • DOI
    10.1109/TPC.1984.6448800
  • Filename
    6448800