Author :
Okabe, Shigemitsu ; Tsuboi, Toshihiro ; Ueta, Genyo
Author_Institution :
R&D Center, Tokyo Electr. Power Co., Yokohama, Japan
Abstract :
At present, a study is being conducted on the lightning impulse (LI) voltage test standard for UHV-class electric power equipment at WG 19 "Adaptation of TC 42 standards to UHV test requirements" in IEC TC42 "High-voltage and high-current test techniques". In the present paper, the past LI voltage test results for UHV-class equipment were initially investigated to determine test waveforms that could be generated. As a result, for a UHV-class transformer and gas insulated switchgear assembly, the front time T1 exceeded 2.2 μs or more, or even considerably 3.0 μs in some cases in order to generate a waveform with an overshoot rate β\´ of 10% or less using existing test facilities. Subsequently, experiments were conducted with regard to the extension of the T1, which is a prospective way to revise the LI voltage test waveform. Breakdown characteristics with respect to the T1 were measured using the largest possible models assuming UHV-class equipment for three types of insulating media, namely an SF6 gas gap, an oil gap, and a long air gap. Consequently, it was confirmed that extending the T1 up to about 3.6 μs had a minor influence on the breakdown characteristics. In addition, a study was also conducted on the influence of the deregulation of the standard value for the T1 from a viewpoint of insulation properties of equipment for the wave front steepness. As a result, it was concluded that the equipment insulation performance could be appropriately verified even if waveforms with an extended T1 were used. Based on these data, the idea of the standard for lightning impulse test waveforms for UHV-class equipment was proposed as follows: The standard voltage waveform shall be the same as the conventional one for less-than-800 kV equipment with a T1 of 1.2 μs and a time to half value of 50 μs but the upper allowable range of the T1- /sub> may be up to 3.6 μs; provided, however, that a note shall be added besides the exceptional provision that, whenever possible, the test should be conducted using a waveform of which the T1 is adjusted to 1.56 μs or less, the same as that for less-than-800 kV equipment.
Keywords :
HVDC power transmission; IEC standards; SF6 insulation; gas insulated switchgear; impulse testing; lightning; power transformers; IEC TC 42 standards; LI voltage test; SF6; UHV test requirements; UHV-class electric power equipment; UHV-class transformer; gas gap; gas insulated switchgear assembly; high-current test techniques; high-voltage test techniques; lightning impulse test waveform; long air gap; oil gap; standard voltage waveform; time 1.2 mus; time 50 mus; voltage test standard; Electric breakdown; Electrodes; Gas insulation; Lightning; Power transformer insulation; Standards; IEC 60060-1; Lightning impulse voltage test; bushing; front time T1; gas insulated switchgear; oil-immersed transformer;