DocumentCode
1540981
Title
Completion and trial operation of the superconducting magnets for the Large Helical Device
Author
Satow, T. ; Yanagi, N. ; Imagawa, S. ; Tamura, H. ; Takahata, K. ; Mito, T. ; Chikaraishi, H. ; Yamada, S. ; Nishimura, A. ; Maekawa, R. ; Iwamoto, A. ; Inoue, N. ; Nakamura, Y. ; Watanabe, K. ; Yamada, H. ; Komori, A. ; Ohtake, I. ; Iima, Makoto ; Satoh,
Author_Institution
Nat. Inst. for Fusion Sci., Nagoya, Japan
Volume
9
Issue
2
fYear
1999
fDate
6/1/1999 12:00:00 AM
Firstpage
1008
Lastpage
1011
Abstract
The Large Helical Device (LHD) is a plasma physics experimental device having two superconducting helical coils and three pairs of poloidal coils. All assembly and attachment works of LHD were completed in January 1998. The trial operation and the first plasma ignition of the eight-year Phase I project for LHD were finished in March just as planned. After that time the first cycle plasma experiment was carried on at a plasma central field of 1.5 T. The second cycle experiment is now conducted. The LHD magnets will be excited to a central field of 3.0 T in December 1998.
Keywords
fusion reactor design; stellarators; superconducting coils; superconducting magnets; 1.5 T; 3 T; Large Helical Device; eight-year Phase I project; first plasma ignition; plasma central field; plasma physics experimental device; poloidal coils; superconducting helical coils; superconducting magnets; trial operation; Assembly; Conductors; Critical current; Current density; Ignition; Physics; Plasma devices; Superconducting coils; Superconducting magnets;
fLanguage
English
Journal_Title
Applied Superconductivity, IEEE Transactions on
Publisher
ieee
ISSN
1051-8223
Type
jour
DOI
10.1109/77.783469
Filename
783469
Link To Document