• DocumentCode
    1540981
  • Title

    Completion and trial operation of the superconducting magnets for the Large Helical Device

  • Author

    Satow, T. ; Yanagi, N. ; Imagawa, S. ; Tamura, H. ; Takahata, K. ; Mito, T. ; Chikaraishi, H. ; Yamada, S. ; Nishimura, A. ; Maekawa, R. ; Iwamoto, A. ; Inoue, N. ; Nakamura, Y. ; Watanabe, K. ; Yamada, H. ; Komori, A. ; Ohtake, I. ; Iima, Makoto ; Satoh,

  • Author_Institution
    Nat. Inst. for Fusion Sci., Nagoya, Japan
  • Volume
    9
  • Issue
    2
  • fYear
    1999
  • fDate
    6/1/1999 12:00:00 AM
  • Firstpage
    1008
  • Lastpage
    1011
  • Abstract
    The Large Helical Device (LHD) is a plasma physics experimental device having two superconducting helical coils and three pairs of poloidal coils. All assembly and attachment works of LHD were completed in January 1998. The trial operation and the first plasma ignition of the eight-year Phase I project for LHD were finished in March just as planned. After that time the first cycle plasma experiment was carried on at a plasma central field of 1.5 T. The second cycle experiment is now conducted. The LHD magnets will be excited to a central field of 3.0 T in December 1998.
  • Keywords
    fusion reactor design; stellarators; superconducting coils; superconducting magnets; 1.5 T; 3 T; Large Helical Device; eight-year Phase I project; first plasma ignition; plasma central field; plasma physics experimental device; poloidal coils; superconducting helical coils; superconducting magnets; trial operation; Assembly; Conductors; Critical current; Current density; Ignition; Physics; Plasma devices; Superconducting coils; Superconducting magnets;
  • fLanguage
    English
  • Journal_Title
    Applied Superconductivity, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1051-8223
  • Type

    jour

  • DOI
    10.1109/77.783469
  • Filename
    783469