• DocumentCode
    1554586
  • Title

    Simultanous emergency demand response programming and unit commitment programming in comparison with interruptible load contracts

  • Author

    Sahebi, M.M. ; Duki, E.A. ; Kia, Mohsen ; Soroudi, Alireza ; Ehsan, Mehdi

  • Author_Institution
    Center of Excellence in Power Syst. Manage. & Control, Sharif Univ. of Technol., Tehran, Iran
  • Volume
    6
  • Issue
    7
  • fYear
    2012
  • fDate
    7/1/2012 12:00:00 AM
  • Firstpage
    605
  • Lastpage
    611
  • Abstract
    Different reasons such as power system restructuring, electricity price variation in some hours of a day and growth in the fuel price, have led to more attention to demand response (DR) programmes for consumers. Two important issues in DR programmes are emergency demand response programming (EDRP) and Interruptible/Curtail able (I/C) programme that is utilised as interruptible load contracts (ILC). The EDDR is utilised to decrease the consumption in peak load or critical hours of the day. This occurs by means of customer´s behaviour in response to the incentives. However, the curtailment of voluntarily loads in the critical hours considering the consumer requirements is an action that can be performed in DR. A model has been proposed for EDRP and ILC implementation in the unit commitment (UC) programme. Then, the effect of these two DR programmes have been compared in long-term UC problem with fuel constraints. The proposed methodology has been formulated as a mixed integer linear problem and implemented in GAMS environment. The proposed model is applied to a 6-bus test system and a modified IEEE 118-bus system to demonstrate its effectiveness.
  • Keywords
    IEEE standards; contracts; integer programming; linear programming; power generation dispatch; power generation scheduling; power markets; 6-bus test system; EDRP; GAMS environment; I-C programming; ILC; UC programming; electricity price variation; emergency demand response programming; fuel price; interruptible load contract; interruptible-curtail programming; mixed integer linear problem; modified IEEE 118-bus system; peak load consumption; power system restructuring; unit commitment programming;
  • fLanguage
    English
  • Journal_Title
    Generation, Transmission & Distribution, IET
  • Publisher
    iet
  • ISSN
    1751-8687
  • Type

    jour

  • DOI
    10.1049/iet-gtd.2011.0806
  • Filename
    6235271