    Improvement of thermal efficiency for combined cycle power plant during load following operation

  • Author

    Matsumoto, H. ; Takahasi, S.

  • Author_Institution
    Res. Lab., Hitachi Ltd., Ibaraki, Japan
  • Volume
    14
  • Issue
    3
  • fYear
    1999
  • fDate
    9/1/1999 12:00:00 AM
  • Firstpage
    787
  • Lastpage
    794
  • Abstract
    An optimization method for unit startup and shutdown timing in the load control system is proposed for combined cycle power plants to improve thermal efficiency during load following operation. The optimum timings are derived from regression equations obtained through offline dynamics simulation analysis. The system is applied to a simulation for a plant of a three-pressure staged reheat type (1650 MW rated capacity) which consists of seven units, and the following points are seen: (1) the larger the load change amount is, the earlier the recommended additional startup timing is; (2) the tendency described in (1) is more remarkable when the load change is faster; and (3) thermal efficiency is expected to be increased by 9% compared with the conventional method
  • Keywords
    combined cycle power stations; control system analysis; control system synthesis; optimal control; power station control; power station load; starting; statistical analysis; thermal analysis; 1650 MW; combined cycle power plant; control design; control simulation; load change; load control system; load following operation; offline dynamics simulation analysis; optimum timings; regression equations; thermal efficiency improvement; unit shutdown timing; unit startup timing; Analytical models; Equations; Knowledge engineering; Load flow control; Optimization methods; Power generation; Power generation economics; Thermal loading; Timing; Turbines;
  • fLanguage
    English
  • Journal_Title
    Energy Conversion, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8969
  • Type

    jour

  • DOI
    10.1109/60.790952
  • Filename
    790952