• DocumentCode
    1561712
  • Title

    Schedule generation and reconfiguration for parallel machines

  • Author

    Luh, Peter B. ; Hoitomt, Debra J. ; Max, Eric ; Pattipati, Krishna R.

  • fYear
    1989
  • Firstpage
    528
  • Abstract
    The authors present a methodology for scheduling independent jobs with due dates on identical parallel machines. The jobs have different levels of importance and various processing times on the machines, and the objective is to minimize the total weighted job tardiness of the schedule. Since the problem is NP-hard, the goal is not to obtain the optimal schedule. Rather, an efficient near-optimal algorithm based on Lagrangian relaxation is presented. A nice feature of this approach is that it provides a lower bound on the cost, which can be used as a measure of suboptimality. On most problems tested, results are within 1% of the optima and have reasonable CPU times. Furthermore, the method provides job interaction information, which is then used to provide quick answers to `what if´ questions, to reconfigure the schedule to accommodate dynamic changes, and also to schedule jobs
  • Keywords
    minimisation; production control; scheduling; Lagrangian relaxation; NP-hard problem; identical parallel machines; schedule generation; schedule reconfiguration; suboptimality; tardiness minimization; total weighted job tardiness; Computer simulation; Dynamic scheduling; Job shop scheduling; Manufacturing systems; Optimal scheduling; Parallel machines; Polynomials; Processor scheduling; Production; Scheduling algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 1989. Proceedings., 1989 IEEE International Conference on
  • Conference_Location
    Scottsdale, AZ
  • Print_ISBN
    0-8186-1938-4
  • Type

    conf

  • DOI
    10.1109/ROBOT.1989.100040
  • Filename
    100040