DocumentCode :
1563970
Title :
Resource constrained and speculative scheduling of an algorithm class with run-time dependent conditionals
Author :
Hannig, Frank ; Teich, Jürgen
Author_Institution :
Dept. of Comput. Sci., Erlangen Univ., Nuremberg, Germany
fYear :
2004
Firstpage :
17
Lastpage :
27
Abstract :
We present a significant extension of the quantified equation based algorithm class of piecewise regular algorithms. The main contributions of the following paper are: the class of piecewise regular algorithms are extended by allowing run-time dependent conditionals; a mixed integer linear program is given to derive optimal schedules of the novel class we call dynamic piecewise regular algorithms; and in order to achieve highest performance, we present a speculative scheduling approach. The results are applied to an illustrative example.
Keywords :
integer programming; linear programming; parallel algorithms; parallel architectures; processor scheduling; mixed integer linear program; optimal scheduling; parallel algorithm; parallel architecture; piecewise regular algorithms; processor arrays; resource constraint; run-time dependent conditionals; speculative scheduling; Communication system control; Computer science; Difference equations; Dynamic scheduling; Heuristic algorithms; Optimal scheduling; Parallel processing; Processor scheduling; Runtime; Scheduling algorithm;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Application-Specific Systems, Architectures and Processors, 2004. Proceedings. 15th IEEE International Conference on
ISSN :
2160-0511
Print_ISBN :
0-7695-2226-2
Type :
conf
DOI :
10.1109/ASAP.2004.1342455
Filename :
1342455
Link To Document :
بازگشت