DocumentCode :
1565582
Title :
Parallel processor scheduling problems with optimal due interval
Author :
Janiak, Adam ; Marek, Marcin
Author_Institution :
Inst. of Eng. Cybern., Wroclaw Univ. of Technol., Poland
fYear :
2004
Firstpage :
383
Lastpage :
387
Abstract :
In the paper we consider two problems, in which we should find a schedule of jobs on parallel processors and a common due interval determination for all jobs such that the criterion value is minimized. A due interval is a generalization of the classical due date and describes a time interval, in which a job should be finished. In the first problem we minimize the sum of the total tardiness, total earliness and due interval size. In the second problem, we minimize the weighted maximum of the following three parts: maximum tardiness, maximum earliness and due interval size. We proved that the considered problems are equivalent to the strong NP-hard classical scheduling problem with the parallel processors subject to the minimization of the makespan criterion.
Keywords :
computational complexity; minimisation; parallel processing; processor scheduling; classical due date; common due interval determination; criterion value minimization; due interval size; job scheduling; makespan criterion; maximum earliness; maximum tardiness; optimal due interval; parallel processor scheduling problems; strong NP-hard classical scheduling problem; time interval; total earliness; total tardiness; Computer science; Cybernetics; Job shop scheduling; Manufacturing systems; Paper technology; Processor scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Science, 2004. ENC 2004. Proceedings of the Fifth Mexican International Conference in
Print_ISBN :
0-7695-2160-6
Type :
conf
DOI :
10.1109/ENC.2004.1342631
Filename :
1342631
Link To Document :
بازگشت