DocumentCode
1565582
Title
Parallel processor scheduling problems with optimal due interval
Author
Janiak, Adam ; Marek, Marcin
Author_Institution
Inst. of Eng. Cybern., Wroclaw Univ. of Technol., Poland
fYear
2004
Firstpage
383
Lastpage
387
Abstract
In the paper we consider two problems, in which we should find a schedule of jobs on parallel processors and a common due interval determination for all jobs such that the criterion value is minimized. A due interval is a generalization of the classical due date and describes a time interval, in which a job should be finished. In the first problem we minimize the sum of the total tardiness, total earliness and due interval size. In the second problem, we minimize the weighted maximum of the following three parts: maximum tardiness, maximum earliness and due interval size. We proved that the considered problems are equivalent to the strong NP-hard classical scheduling problem with the parallel processors subject to the minimization of the makespan criterion.
Keywords
computational complexity; minimisation; parallel processing; processor scheduling; classical due date; common due interval determination; criterion value minimization; due interval size; job scheduling; makespan criterion; maximum earliness; maximum tardiness; optimal due interval; parallel processor scheduling problems; strong NP-hard classical scheduling problem; time interval; total earliness; total tardiness; Computer science; Cybernetics; Job shop scheduling; Manufacturing systems; Paper technology; Processor scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Science, 2004. ENC 2004. Proceedings of the Fifth Mexican International Conference in
Print_ISBN
0-7695-2160-6
Type
conf
DOI
10.1109/ENC.2004.1342631
Filename
1342631
Link To Document