DocumentCode
1570964
Title
Grey chance constrained programming of production planning under uncertainty
Author
Li, Bing ; Gu, Xingsheng
Author_Institution
Res. Inst. of Autom., East China Univ. of Sci. & Technol., Shanghai, China
Volume
4
fYear
2004
Firstpage
2943
Abstract
There are many uncertainties in the process industry. It is important that these uncertain parameters of production process must be considered. In this paper, the grey chance constrained programming was proposed. The grey variables were included in the system restrictions and the strategy to be use must be determined before observing its realization. The concept and method of grey simulation was put forward to give a solution method for the grey chance constrained programming. Finally, mathematical model for production planning which includes grey parameters is studied in details. How to use the grey simulation technology to get the best result based on genetic algorithm was also discussed in this paper. The effectiveness of the model and method is verified by simulation results.
Keywords
genetic algorithms; grey systems; production planning; Grey chance constrained programming; genetic algorithm; grey simulation technology; production planning; production process; Genetic algorithms; Mathematical model; Production planning; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Control and Automation, 2004. WCICA 2004. Fifth World Congress on
Print_ISBN
0-7803-8273-0
Type
conf
DOI
10.1109/WCICA.2004.1343055
Filename
1343055
Link To Document