DocumentCode
1572813
Title
A functional testing approach for interworking between CCS7 TUP and non-CCS7 signaling systems
Author
Lin, Fuchun Joseph ; Cheng, Eric ; Sun, Lir-Fang
Author_Institution
AT&T Bell Lab., Naperville, IL, USA
fYear
1992
Firstpage
572
Abstract
The authors focus on the interworking problem between Common Channel Signaling System No. 7 (CCS7) TUP (telephone user part) and non-CCS7 signaling systems. A novel functional testing approach to verify proper interworking of CCS7 TUP and other non-CCS7 signaling systems in a switching system is presented. Basically, the problem of signaling interworking on a telephone switch is abstracted into functional categories. These categories are used to derive the tests that are crucial in assuring the correctness of signaling interworking in a switching system. It was found that the complex task of testing signaling interworking for a switching system becomes much easier to handle through such a functional testing approach
Keywords
electronic equipment testing; telecommunication signalling; telephone switching equipment; CCS7; Common Channel Signaling System No. 7; TUP; functional testing approach; non-CCS7 signalling systems; signaling interworking; switching system; telephone switch; telephone user part; Communication system signaling; ISDN; Laboratories; Spine; Sun; Switches; Switching systems; System testing; Telephony;
fLanguage
English
Publisher
ieee
Conference_Titel
Communications, 1992. ICC '92, Conference record, SUPERCOMM/ICC '92, Discovering a New World of Communications., IEEE International Conference on
Conference_Location
Chicago, IL
Print_ISBN
0-7803-0599-X
Type
conf
DOI
10.1109/ICC.1992.268217
Filename
268217
Link To Document