DocumentCode :
1573146
Title :
Viewpoint-Based Risk Assessment and Prioritization
Author :
Leung, Hareton K.N.
fYear :
2012
Firstpage :
193
Lastpage :
197
Abstract :
For software projects, different stakeholders may place different emphasis on the same risk. Risks that are important to one stakeholder may be less important or irrelevant to other stakeholders and vice versa. In the overall prioritization of risks for a software project, we need to consider this viewpoint-based difference. This paper first introduces the concept of viewpoint-based assessment of risks and then presents three methods for generating the overall risk prioritization based on the separated viewpoint-based prioritizations. We also present a case study of an outsourced project by applying the proposed methods and illustrate their relative strengths and weaknesses.
Keywords :
Decision making; Delays; Organizations; Risk management; Schedules; Software; Software engineering; Risk assessment; Risk prioritization; Viewpoint-based;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Software Engineering Workshop (SEW), 2012 35th Annual IEEE
Conference_Location :
Heraclion, Crete, Greece
ISSN :
1550-6215
Print_ISBN :
978-1-4673-5574-2
Type :
conf
DOI :
10.1109/SEW.2012.27
Filename :
6479817
Link To Document :
بازگشت