DocumentCode :
1573991
Title :
Challenges facing gencos in new LMP markets
Author :
Khai Le
fYear :
2005
Firstpage :
2835
Abstract :
Summary form only given. In the process of migrating from cost-based to market-based operations, gencos face a host of new challenges. This panel explores the key challenges facing gencos in the market-centric world.
Keywords :
electricity supply industry; power markets; pricing; LMP markets; cost-based operations; gencos; market-based operations; market-centric world; Costs; Economic forecasting; Fuels; ISO; Load forecasting; Portfolios; Risk management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society General Meeting, 2005. IEEE
Print_ISBN :
0-7803-9157-8
Type :
conf
DOI :
10.1109/PES.2005.1489257
Filename :
1489257
Link To Document :
بازگشت