DocumentCode
1574533
Title
Application of california ISO transmission economic assessment methodology (team) for the sunrise powerlink project
Author
Chowdhury, Ali ; Le, David
Author_Institution
California Indep. Syst. Operator, Folsom, CA, USA
fYear
2009
Firstpage
1
Lastpage
5
Abstract
This paper provides a summary of the application of California ISO approach in evaluating economic benefit of the Sunrise Powerlink transmission project, which was proposed by San Diego Gas & Electric Company (SDG&E). The California ISO (CAISO) applied its Transmission Economic Assessment Methodology (TEAM) in its original evaluation of the economic benefits of the Sunrise Powerlink Project. Five principles constitute the methodology: consideration of multiple perspectives; full network model; market-based pricing, accounting for strategic behavior by generators; considerations of uncertainty; and recognition of non-transmission alternatives (generation/demand side substitution).
Keywords
power markets; power transmission economics; power transmission planning; pricing; risk analysis; California ISO transmission economic assessment methodology; market-based pricing; power system economics; power transmission planning; risk analysis; sunrise powerlink project; uncertainty; Costs; Economic forecasting; Fuel economy; ISO; Investments; Power generation economics; Power system planning; Production; Uncertainty; Wind energy generation; Power system economics; Power transmission planning; Risk Analysis; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Power & Energy Society General Meeting, 2009. PES '09. IEEE
Conference_Location
Calgary, AB
ISSN
1944-9925
Print_ISBN
978-1-4244-4241-6
Type
conf
DOI
10.1109/PES.2009.5275185
Filename
5275185
Link To Document