  • Abstract
    This paper provides a summary of the application of California ISO approach in evaluating economic benefit of the Sunrise Powerlink transmission project, which was proposed by San Diego Gas & Electric Company (SDG&E). The California ISO (CAISO) applied its Transmission Economic Assessment Methodology (TEAM) in its original evaluation of the economic benefits of the Sunrise Powerlink Project. Five principles constitute the methodology: consideration of multiple perspectives; full network model; market-based pricing, accounting for strategic behavior by generators; considerations of uncertainty; and recognition of non-transmission alternatives (generation/demand side substitution).
  • Keywords
    power markets; power transmission economics; power transmission planning; pricing; risk analysis; California ISO transmission economic assessment methodology; market-based pricing; power system economics; power transmission planning; risk analysis; sunrise powerlink project; uncertainty; Costs; Economic forecasting; Fuel economy; ISO; Investments; Power generation economics; Power system planning; Production; Uncertainty; Wind energy generation; Power system economics; Power transmission planning; Risk Analysis; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power & Energy Society General Meeting, 2009. PES '09. IEEE
  • Conference_Location
    Calgary, AB
  • ISSN
    1944-9925
  • Print_ISBN
    978-1-4244-4241-6
  • Type

    conf

  • DOI
    10.1109/PES.2009.5275185
  • Filename
    5275185