• DocumentCode
    1575004
  • Title

    Economic benefit evaluation in economic transmission planning

  • Author

    Ni, Ming ; Lawhorn, John

  • Author_Institution
    Midwest ISO, St. Paul, MN, USA
  • fYear
    2009
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    Quantifying the economic benefit of a transmission upgrade is a critical step in economic transmission planning. Because of the complexity of the energy market, and the difficulties of estimating the FTR revenue and marginal loss credit in the planning horizon year, it is not easy to find an economic index which can accurately capture the economic benefit for all kinds of entities. This paper shows that the adjusted production cost can capture the full economic index for three typical entity structures (from the simplest entity (with no interchange with other entities), to the more realistic entities with regulated or de-regulated load) when the money flow of the entity is considered.
  • Keywords
    power markets; power transmission economics; power transmission planning; FTR revenue; adjusted production cost; economic benefit evaluation; economic index; economic transmission planning; energy market complexity; marginal loss credit; Costs; Electricity supply industry; Energy capture; Power generation economics; Production planning; Production systems; Propagation losses; FTR revenue; adjusted production cost; economic benefit; economic transmission planning; electricity market; marginal loss credit; production cost;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power & Energy Society General Meeting, 2009. PES '09. IEEE
  • Conference_Location
    Calgary, AB
  • ISSN
    1944-9925
  • Print_ISBN
    978-1-4244-4241-6
  • Type

    conf

  • DOI
    10.1109/PES.2009.5275207
  • Filename
    5275207