Impact assessment of expanding PJM market area by incorporating incremental loss model
Author
Lin, Yan ; Jordan, Gary ; Whitaker, Everett ; Scheidecker, Paul G. ; Racioppi, Frank J.
Author_Institution
GE Energy, Schenectady, NY, USA
fYear
2005
Firstpage
326
Abstract
Since the Federal Energy Regulatory Commission (FERC) issued order 2000, in December 1999, on the formation of regional transmission organizations (RTOs), Midwest Independent Transmission System Operator, Inc. (Midwest ISO) and PJM RTO (parts of Pennsylvania, New Jersey and Maryland) have become the first two RTOs, unconditionally approved by FERC. Recently, electric utility, Commonwealth Edison (ComEd), serving electrical load in greater Chicago metropolitan area, has been accepted to PJM RTO to integrate their control area into PJM´s market area. The integrated market has been operational since May 1, 2004. PJM market monitoring unit (MMU) is charged with the task of evaluating the competitiveness of that expanded market area. As control areas of ComEd and PJM are not contiguous, a dedicated transmission pathway with 500 MW firm capacity between ComEd and PJM through American Electric Power (AEP) is also assumed in the study. There are numerous benefits to count, associated with that expanded market, particularly to consumers in Illinois. This paper presents the assessment of system-wide economic and cost impact if both PJM and Comed are operated as a single market area using incremental loss model. The results are shown for pre- and post-integration market conditions, using security-constrained unit commitment and economic dispatch algorithm model with locational marginal pricing (LMP) calculation.
Keywords
power generation dispatch; power generation economics; power generation scheduling; power markets; pricing; American Electric Power; Federal Energy Regulatory Commission; Midwest Independent Transmission System Operator; economic dispatch algorithm model; incremental loss model; locational marginal pricing; market monitoring unit; regional transmission organizations; security-constrained unit commitment; Costs; ISO; Monitoring; Power generation economics; Power industry; Power system economics; Power system modeling; Pricing; Propagation losses; Urban areas;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2005. IEEE
Print_ISBN
0-7803-9157-8
Type
conf
DOI
10.1109/PES.2005.1489327
Filename
1489327
Link To Document