DocumentCode :
157559
Title :
Probabilistic risk assessment applied to maintenance schedule of HVDC
Author :
Tao Wang ; Lin Guan
Author_Institution :
Sch. of Electr. Power, South China Univ. of Technol., Guangzhou, China
fYear :
2014
fDate :
7-10 July 2014
Firstpage :
1
Lastpage :
5
Abstract :
This paper proposes a novel risk evaluation system for HVDC planned maintenance using probabilistic method. A quantitative evaluation method is put forward to measure how HVDC system maintenance affects power system reliability. Two major indexes, which are loss of load probability (LOLP) and Security Index (SI), are chosen to construct the power grid operation risk indexes. Based on the calculation of historical operation data and advices of dispatching department, the criterion for evaluating the HVDC planned maintenance is proposed. The methodology provides an effective analysis tool for scheduling department to choose the appropriate time to arrange maintenance. Finally, a study of China Southern Power Grid is carried out in order to demonstrate the efficiency of the proposed risk evaluation system.
Keywords :
HVDC power transmission; maintenance engineering; power grids; power transmission planning; power transmission reliability; risk management; scheduling; China Southern Power Grid; HVDC planned maintenance; HVDC system maintenance; historical operation data; loss of load probability; maintenance schedule; power system reliability; probabilistic method; probabilistic risk assessment; quantitative evaluation method; risk evaluation system; scheduling department; security index; HVDC transmission; Indexes; Maintenance engineering; Power grids; Power system reliability; Reliability; HVDC; planned maintenance; power system; risk assessment;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Probabilistic Methods Applied to Power Systems (PMAPS), 2014 International Conference on
Conference_Location :
Durham
Type :
conf
DOI :
10.1109/PMAPS.2014.6960608
Filename :
6960608
Link To Document :
بازگشت