Implementation of reliability-centered maintenance for circuit breakers
Author
Chan, Ting ; Liu, Chen-Ching ; Choe, Jong-Woong
Author_Institution
Dept. of Electr. Eng., Washington Univ., Seattle, WA, USA
fYear
2005
Firstpage
684
Abstract
Power system reliability is highly related to the way maintenance tasks on system equipment are performed. Time-based maintenance (TBM) has been practiced as the usual maintenance scheduling strategy in electrical energy systems for many years. While this approach has the advantage of simple scheduling and high availability, it is not the most cost effective. The objective of this project is to develop a generic decision support tool for maintenance of power circuit breakers based on the concept of reliability-centered maintenance (RCM). Reliability-centered maintenance not only considers the actual condition of a piece of equipment but also the relative importance of the equipment to the whole system and is expected to be more cost effective than the traditional approaches.
Keywords
circuit breakers; maintenance engineering; power system reliability; scheduling; circuit breakers; electrical energy systems; generic decision support; maintenance scheduling strategy; power system reliability; reliability-centered maintenance; system equipment; time-based maintenance; Availability; Circuit breakers; Costs; Decision making; Electrical equipment industry; Failure analysis; Job shop scheduling; Maintenance; Power system reliability; Substations;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2005. IEEE
Print_ISBN
0-7803-9157-8
Type
conf
DOI
10.1109/PES.2005.1489338
Filename
1489338
Link To Document