• DocumentCode
    1576303
  • Title

    Fiber in the loop systems powering: Bellcore requirements

  • Author

    Salloum, Hady R. ; Moisan, Kevin J.

  • Author_Institution
    Bellcore, Morristown, NJ, USA
  • fYear
    1992
  • Firstpage
    117
  • Lastpage
    123
  • Abstract
    Power and reserve power are significant challenges to fiber in the loop (FITL) deployment. Power requirements must reflect short-term needs and the ability to move to future networks and capabilities. Major requirements in the power area are identified, together with open issues, including power system communications with remote operations systems, common optical network unit/host digital terminal (ONU/HDT) primary DC source, the impact of broadband/video service upgrades on power, and fault location for power distribution networks
  • Keywords
    distribution networks; fault location; optical links; power supplies to apparatus; Bellcore requirements; FITL; broadband service upgrades; fault location; fiber in the loop; host digital terminal; optical network unit; power distribution networks; primary DC source; video service upgrades; Optical fiber devices; Optical fibers; Optical network units; Power generation economics; Power supplies; Power system economics; Power system reliability; Switching systems; Telecommunication traffic; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Telecommunications Energy Conference, 1992. INTELEC '92., 14th International
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-0779-8
  • Type

    conf

  • DOI
    10.1109/INTLEC.1992.268453
  • Filename
    268453