DocumentCode
1576827
Title
Verification by tests of models proposed for synchronous machines, excitation control systems, water supply and turbines and its control systems for Colbun and Machicura power plants
Author
Agüero, J.L. ; Almarza, L. Bastidas ; Beroqui, M.C. ; Bornvin, S.F.
Author_Institution
Fac. de Ingenieria, Univ. Nacional de La Plata, Argentina
fYear
2005
Firstpage
1071
Abstract
In this paper several models proposed for excitation control systems, synchronous machines, prime movers control system and turbines corresponding to the hydraulic power plants of Colbun and Machicura are shown and verified. These power plants are located in the "interconnected central system" (SIC), Chile\´s largest grid and are part of the Colbun subsystem. This grid subsystem also bears industrial load. It supplies energy to "El Teniente" -world\´s largest copper mine- and to several paper manufacturing plants. The models were used to study the Colbun subsystem under island operation when the SIC blacks out due to under-frequency conditions.
Keywords
hydraulic turbines; hydroelectric power stations; machine control; machine testing; power generation control; power grids; synchronous machines; water supply; Colbun hydraulic power plants; El Teniente energy supply; Machicura hydraulic power plants; excitation control systems; grid subsystem; paper manufacturing plants; prime movers control system; synchronous machine testing; turbines; water supply; Control system synthesis; Electrical equipment industry; Hydraulic turbines; Manufacturing industries; Power generation; Power system interconnection; Power system modeling; Silicon carbide; Synchronous machines; System testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2005. IEEE
Print_ISBN
0-7803-9157-8
Type
conf
DOI
10.1109/PES.2005.1489369
Filename
1489369
Link To Document