• DocumentCode
    1577954
  • Title

    The Ericsson´s approach to software improvements

  • Author

    Imbor-Maciag, Barbara

  • fYear
    1995
  • Firstpage
    512
  • Abstract
    In 1993 Ericsson Corporate initiated the ESSI (Ericsson Systems Software Initiative), to achieve breakthrough improvements in software developments. Ericsson Australia`s software improvement program is being carried out in the form of a project. A baseline was defined in Feb??95 through the CMM assessment. The assessment team comprised of members of the Ericsson Design Centres in Brazil, Mexico, USA, Holland, Sweden and Australia. The project, called SWIFT (Software Improvement For System Design and Engineering Division), is run according to standard Ericsson project methodology - PROPS - with defined project Milestones and Tollgates. Ericsson Australia intends to use the Ericsson improvement cycle PDCA (Plan, Do, Check, Act) as a main improvement methodology. Upon conclusion of the SWIFT, the next improvement cycle will be defined and carried out.
  • Keywords
    Coordinate measuring machines; Design engineering; Planning; Programming; Project management; Software tools; System software; Systems engineering and theory;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Software Engineering Conference, 1995. Proceedings., 1995 Asia Pacific
  • Conference_Location
    Brisbane, Queensland, Australia
  • Print_ISBN
    0-8186-7171-8
  • Type

    conf

  • DOI
    10.1109/APSEC.1995.497002
  • Filename
    497002