DocumentCode :
1579469
Title :
Integrated generation and transmission planning tools — PTO perspective
Author :
Aggarwal, R.K. ; Mittelstadt, W.A.
Author_Institution :
BPA, Portland, OR, USA
fYear :
2009
Firstpage :
1
Lastpage :
3
Abstract :
This paper, one of four presented at the panel session on integrated generation and transmission planning tools, provides a participating transmission owner´s (PTO) perspective. The paper focuses on the developing functional requirements for such tools and addresses a variety of factors including - ldquowhat-ifrdquo analysis related to rate of return (ROR) analyses on investments and associated risk, transmission (or upgrading) siting, and optimal timing (when and how long) of maintenance. Cases are briefly noted where the application of such tools may change the outcome of a transmission expansion study or improve operations and maintenance efficiency.
Keywords :
maintenance engineering; power generation planning; power transmission planning; risk analysis; PTO perspective; investment risk analyses; maintenance efficiency; participating transmission owner perspective; power generation planning; power transmission planning; rate-of-return analyses; transmission expansion study; what-if analysis; Decision making; Econometrics; Investments; Power system planning; Process planning; Proposals; Risk analysis; Risk management; Stability analysis; Testing; Integrated Generation and Transmission; Planning; Rate of Return analysis; Risk Assessment; Tools; financial risk;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power & Energy Society General Meeting, 2009. PES '09. IEEE
Conference_Location :
Calgary, AB
ISSN :
1944-9925
Print_ISBN :
978-1-4244-4241-6
Type :
conf
DOI :
10.1109/PES.2009.5275372
Filename :
5275372
Link To Document :
بازگشت