DocumentCode :
1579861
Title :
Semiconductor fab maintenance challenge and BKM in downturn economy
Author :
Massie, Todd J.
Author_Institution :
Microelectron. Div., IBM Corp., Essex Junction, VT, USA
fYear :
2002
fDate :
6/24/1905 12:00:00 AM
Firstpage :
228
Lastpage :
230
Abstract :
The challenge of staying competitive in the current business environment towards opportunities requires creativity and new extreme thinking. Teamwork and taking risks are imperative to success. Our Novellus equipment maintenance team in the IBM Microelectronics Division Burlington is continually finding creative methodologies over and above the Best Known Methods (BKM) to drive towards better business decisions that translate directly into productivity improvements. Whereas Mean Time to Repair (MTR) could go up due to increased in-house solutions, every effort is driven towards maintaining the equipment availability at target. In this presentation, I will discuss the methodologies the maintenance team deployed to stay at productivity target and yet manage the cost of ownership at reduced spending. Primarily, I will show hardware and software examples that the team saw to be opportunities for improvement.
Keywords :
maintenance engineering; semiconductor device manufacture; Best Known Method; Mean Time to Repair; business environment; cost of ownership; equipment availability; productivity; semiconductor fab maintenance; Availability; Costs; Equipment failure; Hardware; Microelectronics; Preventive maintenance; Production facilities; Productivity; Rivers; Teamwork;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Advanced Semiconductor Manufacturing 2002 IEEE/SEMI Conference and Workshop
Print_ISBN :
0-7803-7158-5
Type :
conf
DOI :
10.1109/ASMC.2002.1001609
Filename :
1001609
Link To Document :
بازگشت