• DocumentCode
    1581228
  • Title

    Incorporating demand response in operating reserve in New England

  • Author

    Burke, Robert B. ; Henderson, Michael I.

  • fYear
    2005
  • Firstpage
    1570
  • Abstract
    Many types of demand response programs have been developed with some programs designed to provide reliability benefits. In general, demand response participation in the real-time wholesale market and the ancillary services market (ASM), in particular, has been extremely limited. This limitation in participation is the direct result of these markets requiring performance and telemetry that is similar to quick start generation. ISO New England (ISO-NE) has undertaken the development of a Demand Response Reserve Project. The goals of the project include: 1) achieving consistency with NPCC requirements of capacity resources, 2) examining acceptable telemetry options for demand response, (which can provide functionally equivalent information to the system operator). This paper describes the Demand Response Reserve Project (DRRP) currently under development by ISO-NE. The DRRP is presently scheduled for implementation on October 1, 2005.
  • Keywords
    power markets; telemetry; Demand Response Reserve Project; ISO New England; New England; ancillary services market; demand response; operating reserve; real-time wholesale market; reliability benefits; Automatic generation control; Forward contracts; ISO standards; Load flow control; Load management; Power generation economics; Power system reliability; Real time systems; Spinning; Telemetry;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2005. IEEE
  • Print_ISBN
    0-7803-9157-8
  • Type

    conf

  • DOI
    10.1109/PES.2005.1489535
  • Filename
    1489535