DocumentCode
1581228
Title
Incorporating demand response in operating reserve in New England
Author
Burke, Robert B. ; Henderson, Michael I.
fYear
2005
Firstpage
1570
Abstract
Many types of demand response programs have been developed with some programs designed to provide reliability benefits. In general, demand response participation in the real-time wholesale market and the ancillary services market (ASM), in particular, has been extremely limited. This limitation in participation is the direct result of these markets requiring performance and telemetry that is similar to quick start generation. ISO New England (ISO-NE) has undertaken the development of a Demand Response Reserve Project. The goals of the project include: 1) achieving consistency with NPCC requirements of capacity resources, 2) examining acceptable telemetry options for demand response, (which can provide functionally equivalent information to the system operator). This paper describes the Demand Response Reserve Project (DRRP) currently under development by ISO-NE. The DRRP is presently scheduled for implementation on October 1, 2005.
Keywords
power markets; telemetry; Demand Response Reserve Project; ISO New England; New England; ancillary services market; demand response; operating reserve; real-time wholesale market; reliability benefits; Automatic generation control; Forward contracts; ISO standards; Load flow control; Load management; Power generation economics; Power system reliability; Real time systems; Spinning; Telemetry;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2005. IEEE
Print_ISBN
0-7803-9157-8
Type
conf
DOI
10.1109/PES.2005.1489535
Filename
1489535
Link To Document