DocumentCode
1581954
Title
Implementation of a distributed control system for electric distribution circuit reconfiguration
Author
Craig, Dean ; Befus, Craig
Author_Institution
ENMAX Power Corp., Calgary, Alta., Canada
fYear
2005
Firstpage
2436
Abstract
ENMAX Power Corporation in Calgary, Alberta, Canada is embarking on a multi-year project to improve the reliability of their electric distribution system. To this end they are deploying a distributed control system on their least reliable electric distribution circuits to automatically isolate faults and restore power to unfaulted segments. The paper describes the distributed control system, how it was integrated into the utility´s existing SCADA system, and the reliability improvements that have been realized in the first year of operation.
Keywords
SCADA systems; distributed control; power distribution control; power distribution faults; power distribution reliability; Alberta; Calgary; Canada; ENMAX Power Corporation; SCADA system; automatic fault isolation; distributed control system; electric distribution circuit reconfiguration; electric distribution system reliability; reliability improvements; Circuit faults; Distributed control; Integrated circuit reliability; Intelligent control; North America; Power system reliability; Power system restoration; SCADA systems; Substation automation; Switches;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2005. IEEE
Print_ISBN
0-7803-9157-8
Type
conf
DOI
10.1109/PES.2005.1489563
Filename
1489563
Link To Document